AI Assistant · LOG
Logistics AI
Right thing, right place, right time
Online
For you as · Team Leader · Nawaf Al-Mutairi
You have decisions waiting in Logistics AI. Approving unlocks value from the KWD 18M pool today.
KOC business value P-06 · Operational Excellence P-04 · Decarbonization· Cost / bbl Uptime KWD 18M annualised value
The problem today
Fleet, marine and helicopter movements are planned in silos; 20%+ idle time is normal.
What Bayan does
Re-optimises dispatch every 5 minutes across 2,400 vehicles and 24 helicopters.
Path to KOC 2040
Operational Excellence88%
847 days LTI-free · 99.4% uptime → Top-quartile HSE + uptime
Decarbonization62%
0.42% flaring · 8.6 kgCO₂/bbl → Zero routine flaring · −25% intensity
Logistics & supply-chain scorecard
Industry-standard upstream KPIs · targets · peer benchmarks
Logistics health
OTIF above target; rig-move cycle time trimmed 11% via route optimisation. Yard turnover at Ahmadi ahead of plan. Marine window at Mina Al-Ahmadi remains the constraint.
OTIF
On-time in-full to site
93%
tgt90%+3.0
Peer NOC92%+1.0
Above target — Ahmadi yard automation the driver.
Rig-move hrs
Rig-move cycle time
62hrs
tgt72hrs+10.0
IOC top-quartile60hrs-2.0
Below target — cluster pads compressed the loop.
Fleet util.
Heavy-fleet utilisation
78%
tgt75%+3.0
Peer NOC82%-4.0
On plan; still upside from route optimiser.
Fuel L/km
Fuel consumption per km
0.42L/km
tgt0.45L/km+0.0
IOC top-quartile0.4L/km-0.0
Below target — eco-driving telematics live on 60% of fleet.
Marine wait
Berth waiting time
6.4hrs
tgt6hrs-0.4
Peer NOC5.5hrs-0.9
Amber — Mina Al-Ahmadi congestion the constraint.
Yard turnover
Ahmadi yard turnover
3.1days
tgt3.5days+0.4
IOC top-quartile2.8days-0.3
Below target — cross-docking rollout complete.
Going good
On plan right now
- Reroute crew bus 14 · Rd-80Saves 23 min, 41 L diesel. · 04:30
- Fleet size: 1,084+18
- Routes optimized: 612+48
Needs attention
Early warnings — not decisions yet
- Move material · RIG-07 from yard B → APredicted demand at A increases 30% today.
- Re-slot VLCC at MAA SPM-1 to T+2h window — avoids $48k demurrage and prevents nesting conflict with STB-204.
- Consolidate material runs to RIG-07 / RIG-12 into single convoy — 9% fuel saving + 1 supervisor freed.
External signals
- Baltic Exchange· 3h agolowVLCC AG-East freight index up 4 points on Hormuz insurance premia↳ Two loadings this week — hedge freight now or push nomination one day right.
- Kuwait Met Dept· 20m agomedDust advisory: visibility <500m across North Kuwait 14:00–19:00↳ Helicopter and crew-bus schedules to Raudhatain and Sabriya are at risk.
Needs your decision
Approval goes to the audit ledger
- Stagger helicopter departures · KOC heliportTwo routes conflict at 13:15, headwind 18kt.Safer + 12% fuel saving.12:30· 79%
Automation
2 active rules
Recently auto-handled
- Auto-approve08:50 PMRerouted crew bus 14 · dust advisoryMet Dept advisory amber
Rules ready to run now
- Auto-approveAuto-reroute crew buses on weather advisory
- Auto-notifyNotify Aviation Ops on wind envelope breach