AI Assistant · RES
Reservoir Management AI
Every drop, sustainably recovered
Online
For you as · Team Leader · Nawaf Al-Mutairi
You have decisions waiting in Reservoir Management AI. Approving unlocks value from the KWD 96M pool today.
KOC business value P-01 · Sustainable Capacity P-03 · Heavy Oil Ramp P-06 · Operational Excellence· Production Cash KWD 96M annualised value
The problem today
Recovery factor across Greater Burgan is ~40% — every extra 1pp is ~180 MMbbl of reserves.
What Bayan does
Tracks VRR by panel, refreshes decline curves nightly, and ranks EOR patterns against economics.
Path to KOC 2040
Sustainable Capacity60%
2.41 MMbbl/d (2.90 capacity) → 4.00 MMbbl/d by 2040
Heavy Oil Ramp19%
52 kbbl/d → 270 kbbl/d Lower Fars
Going good
On plan right now
- Recovery factor path: 42.0 %+2pp by 2030 with EOR
- EOR patterns screened: 124 pass economics
- Reserve outlook Δ: +180 MMbbl+1pp RF
Needs attention
Early warnings — not decisions yet
- Update waterflood VRR · Greater Burgan north panelVRR trending 1.14 — over-injection risk in Wara sand.
- Burgan N-panel VRR at 1.14 — rebalance ~18 injectors to protect Wara sweep and free 22 kbwd for S-panel.
- Ratqa Lower Fars Phase-1 history-match error dropped 4.0 → 1.6% — confidence for 270 kbbl/d plan up 6pp.
Needs your decision
Approval goes to the audit ledger
- Auto-refresh decline curves · 214 wellsMonthly cadence + 4 wells shifted between segments.Reserve outlook aligned to actuals within ±3%.08:30· 88%
- Screen 12 EOR candidates · CO₂ / polymerScreening scoreboard exceeds threshold on 4 patterns.Feeds 2030 recovery-factor uplift roadmap.12:00· 76%
- History-match update · Lower Fars Phase-1New PLT + 3 tracer results shifted match error 4→1.6%.Confidence for Ratqa 270 kbbl/d plan +6pp.16:00· 82%
Automation
0 active rules
Recently auto-handled
Nothing has auto-run yet
Rules ready to run now
No rules enabled