AI Assistant · PIP
Pipeline Integrity
Zero leaks. Always.
Online
For you as · Team Leader · Nawaf Al-Mutairi
You have decisions waiting in Pipeline Integrity. Approving unlocks value from the KWD 34M pool today.
KOC business value P-06 · Operational Excellence P-04 · Decarbonization· Uptime HSE KWD 34M annualised value
The problem today
3,800+ km of trunk & flowlines; corrosion + third-party interference remain #1 integrity risk.
What Bayan does
Fuses ILI, CP and pressure signals into a live segment-by-segment risk score.
Path to KOC 2040
Operational Excellence88%
847 days LTI-free · 99.4% uptime → Top-quartile HSE + uptime
Decarbonization62%
0.42% flaring · 8.6 kgCO₂/bbl → Zero routine flaring · −25% intensity
Pipeline integrity scorecard
Industry-standard upstream KPIs · targets · peer benchmarks
Integrity health
Zero loss-of-containment events YTD. ILI coverage 97%. Two corrosion hotspots on the Ahmadi trunk line remediated. Cathodic protection effectiveness holds above 92%.
LOC events
Loss-of-containment (YTD)
0
tgt0+0.0
IOGP median1+1.0
Zero YTD — stretch target met.
Incidents/1000km
Incidents per 1000 km
0.14
tgt0.2+0.1
IOGP median0.3+0.2
Well below industry median.
ILI coverage
In-line inspection coverage
97%
tgt95%+2.0
Peer NOC92%+5.0
Above target — full trunk-line coverage this quarter.
CP effective
Cathodic protection effective
92.4%
tgt90%+2.4
Peer NOC91%+1.4
On plan; 2 rectifier stations flagged for maintenance.
Leak detect ms
Leak detection latency (avg)
42s
tgt60s+18.0
IOC top-quartile45s+3.0
Below target — fibre + mass-balance fusion working.
Corrosion rate
Avg internal corrosion rate
0.09mm/yr
tgt0.12mm/yr+0.0
Peer NOC0.1mm/yr+0.0
Below target — inhibitor program on target.
Going good
On plan right now
- Bring forward ILI · 36" trunk KM 42–48Reduces leak probability 0.21 → 0.07. · 02:00
- Integrity score: 92.6 /100+0.4
- ILI on-schedule: 94 %+6 pp
Needs attention
Early warnings — not decisions yet
- Lower MAOP by 4% · segment NK-12Pressure-wave anomaly cluster detected.
- TL-01 (GC-3 → Mina Ahmadi) risk score 78 — bring next ILI forward 6 weeks; prioritize dig at KM 18 to avoid 2023-pattern rupture.
- TL-12 (Wafra → MAA) wax deposition + corrosion combine — schedule biocide pig and reduce flow rate by 6% for 14 months runway.
External signals
- ILI Vendor (ROSEN)· 1d agomedNew MFL algorithm reduces false positives on <3mm pit depth by 28%↳ Rerun 2025 ILI on 36" trunk — cheaper than mobilising a new inspection.
Needs your decision
Approval goes to the audit ledger
- Dispatch CP technician · KM 88CP reading dropped below threshold for 3h.Prevents accelerated corrosion zone.10:00· 82%
Automation
2 active rules
Recently auto-handled
Nothing has auto-run yet
Rules ready to run now
- Auto-notifyNotify Integrity Eng. on pressure-wave anomaly
- Auto-deferDefer inspection re-baseline to next ILI cycle