OPERATIONS MAP · LIVE 1:1 TWIN
Every barrel, every pipeline, every decision
A live mirror of KOC's 23 gathering centres, 16 trunk lines, 6 processing facilities and 1,400 critical assets — grounded in real operational problems: Burgan water cut, Lower Fars steam, AGRU uptime, and pipeline corrosion.
12,408 assets synced3.22 M tags/s
Bayan · value to KOCOne AI platform defending KOC's 2040 targets — every day, every field. KWD 1.42B annualised value
P-01
Sustainable Capacity
2.41 MMbbl/d (2.90 capacity)60%
→ 4.00 MMbbl/d by 2040
P-02
Gas Self-Sufficiency
720 mn cfd non-associated54%
→ Eliminate LNG imports
P-03
Heavy Oil Ramp
52 kbbl/d19%
→ 270 kbbl/d Lower Fars
P-04
Decarbonization
0.42% flaring · 8.6 kgCO₂/bbl62%
→ Zero routine flaring · −25% intensity
P-05
Kuwaitization & Talent
78% national · 62% technical78%
→ ≥85% national workforce
P-06
Operational Excellence
847 days LTI-free · 99.4% uptime88%
→ Top-quartile HSE + uptime
Crude Output Now
2.41
MMbbl/d · quota 2.548
Days Since Spill
847
Mar 2023 Ahmadi rupture
Flare Rate (FY)
0.51%
Limit 0.80%
Burgan Water Cut
46%
12 wells >90%
Non-Assoc. Gas
720
mn cfd · target 1 Bcfd
Active Alerts
3
7 watch items
Search
Find any asset across the twin
Layers
Filters
Status
Region
Anomaly Queue
Ranked by AI risk score
Live Network Twin
33 assets · 16 pipeline segments shown
Streaming3D Schematic
Field Facility / Terminal Sensor Warning AlertClick any node →
Burgan water-cut intervention
SLB Hi-Ex squeeze on 12 wells >90% water cut
AGRU pull-forward shutdown
Avoid emergency flare if C-12 fails in 9 days
Lower Fars steam ramp +8%
Heavy oil push toward 270 kbbl/d 2040 target
Asset Inspector
Field · South
Greater Burgan
ID · burgan
Production
1.1MMbbl/d
Wells
486
Pressure
1,900psi
Temperature
78°C
Water cut
14%
Health
92/100
AI Insight
Operating within optimal envelope. Marginal upside via choke re-balance.
Predictions
30-day output32.7 MMbbl91%
Intervention requiredNone86%
Recommended actions
Linked critical equipment
PMP-204ESP PumpRUL 42d
Greater Burgan — Well Health Grid
60 producers · water-cut % per well · 5 critical, 8 watch
<50% 50–75% 75–90% watch >90% criticalred dot = ESP fault
BG-2203 · Sabriya
Water cut 92% · prod 0.8 kbbl/d · ESP ok
AI recommendation: SLB Hi-Ex cement squeeze through 2.25-in restriction. Comparable Burgan wells delivered ~200% production uplift (SLB Jan 2025). Payback ≈ 47 days at $72 Brent.
Live Flare Stacks
5 of 23 gathering centres · limit 0.80% · MoE reportable above
GC-3 Burgan
0.42% · 38 mn cfdGC-7 Raudhatain
0.71% · 22 mn cfdGC-12 Sabriya
0.38% · 28 mn cfdGC-17 South
0.84% · 18 mn cfdGC-23 West
0.49% · 16 mn cfdGC-17 South trending toward 0.80% limit — Compressor C-12 vibration spike suspected. AI playbook: pull-forward AGRU shutdown by 21 days to avoid emergency venting and MoE notification.
Pipeline Integrity Watch
16 trunk lines · corrosion risk score from ILI, sensor drift & ECDA model
| Segment | Length | Age | Corrosion risk | Last ILI | AI action |
|---|---|---|---|---|---|
TL-01Burgan → Ahmadi Trunk (36") | 42 km | 38y | 18 | 142d | On schedule |
TL-04Ahmadi West header (2023 rupture line) | 28 km | 41y | 71 | 12d | Dispatch ILI pig + reduce pressure 8% |
TL-07Raudhatain → GC-7 24" gas gathering | 22 km | 19y | 24 | 88d | On schedule |
TL-09Wafra → PP-1 heavy oil 18" | 64 km | 8y | 31 | 56d | On schedule |
TL-12Sabriya water injection header | 18 km | 28y | 58 | 201d | Schedule ECDA walk-down |
TL-15Umm Gudair → GC-3 16" | 36 km | 33y | 82 | 312d | Dispatch ILI pig + reduce pressure 8% |
TL-18Storage A → Mina Al-Ahmadi 42" | 14 km | 22y | 15 | 31d | On schedule |
TL-21PNZ Wafra crosstie 20" | 48 km | 17y | 27 | 74d | On schedule |
Last spill: Mar 20 2023 — Ahmadi West pipeline rupture triggered a State of Emergency. AI now models remaining wall thickness from acoustic sensors + soil resistivity to flag segments before failure — pre-empting the next event.
AVEVA PI Historian
2.4M tags/s · 142 ms lag · 23 GCs
Emerson DeltaV / Honeywell
1.1M tags/s · 88 ms lag · sour gas
WirelessHART Edge IoT
3.2M msgs/s · 64 ms · 1,400 assets