For you as · Team Leader · Nawaf Al-Mutairi
You have decisions waiting in Predictive Maintenance. Approving unlocks value from the KWD 92M pool today.
KOC business value P-06 · Operational Excellence P-01 · Sustainable Capacity· Uptime Cost / bbl KWD 92M annualised value
The problem today
Rotating equipment failures cause 60% of unplanned deferment; USD 300M AI-PdM programme underway.
What Bayan does
Predicts failures 9–30 days out and schedules the shortest, cheapest outage window.
Path to KOC 2040
Operational Excellence88%
847 days LTI-free · 99.4% uptime → Top-quartile HSE + uptime
Sustainable Capacity60%
2.41 MMbbl/d (2.90 capacity) → 4.00 MMbbl/d by 2040
Reliability & maintenance scorecard
Industry-standard upstream KPIs · targets · peer benchmarks
Reliability health
MTBF up 11% YoY on rotating equipment; PM compliance holds above 95%. Bad-actor list down from 42 to 27 assets. Maximo backlog still 6 weeks — automation queue recommends triage.
MTBF (rotating)
Mean time between failures
4180hrs
tgt4000hrs+180.0
IOC top-quartile4600hrs-420.0
Above target — vibration analytics catching bearings early.
MTTR
Mean time to repair
6.4hrs
tgt7hrs+0.6
IOC top-quartile5.5hrs-0.9
On track; parts availability is the constraint.
PM compliance
Preventive maintenance compliance
95.8%
tgt95%+0.8
IOC top-quartile97%-1.2
Just above target — schedule adherence at GC-24 slipping.
Backlog (wks)
Maintenance backlog
6.1wks
tgt4wks-2.1
IOC top-quartile3.5wks-2.6
Amber — parts lead-time driving the gap.
OEE
Overall equipment effectiveness
82%
tgt80%+2.0
IOC top-quartile85%-3.0
Above target; availability and quality strong, performance the gap.
Bad actors
Bad-actor assets (>3 failures)
27
tgt30+3.0
IOC top-quartile20-7.0
Below target — 15 assets exited list this quarter.
Going good
On plan right now
- Schedule outage · Compressor C-12Prevents unplanned trip ($2.4M deferment). · 01:00
- Failures prevented YTD: 284+18
- MTBF · ESP fleet: +22%on plan
Needs attention
Early warnings — not decisions yet
- Order spare seals · PMP-204Failure probability 0.41 within 30d, lead time 22d.
- AGRU-C12 bearing 4x harmonic rising — RUL 9 days · pull-forward maintenance window to avoid emergency flare event.
- ESP-BG-441 motor signature matches 14 prior failures — replace within 14 days, SLB Hi-Ex stocked in Ahmadi yard.
External signals
- OEM (Solar Turbines)· 3d agohighService bulletin SB-2026-14: bearing wear on Titan 130 units at >48k op-hours↳ GTR-9 crosses 48k hours next month — pull inspection forward, protect the outage window.
- ILI Vendor (ROSEN)· 1d agomedNew MFL algorithm reduces false positives on <3mm pit depth by 28%↳ Rerun 2025 ILI on 36" trunk — cheaper than mobilising a new inspection.
Needs your decision
Approval goes to the audit ledger
- Re-route load · GTR-9Vibration trending up; temperature delta +6°C.Buys 14 days to plan outage.09:00· 78%
- Combine work orders · Sabriya pad5 small jobs fit one isolation window.Saves 18 maintenance hours.13:00· 86%
Automation
1 active rules
Recently auto-handled
- Auto-delegate10:46 PMRouted PMP-204 spares work-pack to PlannerRUL 9d < 14d threshold
Rules ready to run now
- Auto-delegateRoute work-pack to Planner when RUL < 14d